Double-Storey Rear House Extension & Remodel

Surrey, South EastOctober 20264 Progression Photos
Double-Storey Rear House Extension & Remodel
Featured Final ResultCompleted deliverable and verified inspection milestone.

Scope & Specifications

Complete domestic ground-up expansion featuring strip foundations, cavity blockwork, structural steel beam insertion to create an open-plan kitchen-diner, pitched slate roof matching the original property, complete electrical first/second fix with recessed downlights, and bi-fold glass door integration.

Jobsite Progression

Chronological Build Timeline

Visual proof log sequenced automatically by photo timestamp.

4 Mar 2024
Excavation of strip footings, concrete foundation pour, and sub-floor drainage run.

Excavation of strip footings, concrete foundation pour, and sub-floor drainage run.

18 Apr 2024
Cavity wall brickwork raised to wall plate level and timber roof trusses pitched.

Cavity wall brickwork raised to wall plate level and timber roof trusses pitched.

25 May 2024
First-fix electrical wiring, consumer unit routing, plumbing feeds, and Kingspan thermal insulation boards.

First-fix electrical wiring, consumer unit routing, plumbing feeds, and Kingspan thermal insulation boards.

12 Jul 2024
Completed build handover: skim coat plastering, engineered oak flooring, roof lanterns, and bi-fold doors.
Completed Result

Completed build handover: skim coat plastering, engineered oak flooring, roof lanterns, and bi-fold doors.