Double-Storey Rear House Extension & Remodel
Surrey, South EastOctober 20264 Progression Photos
Featured Final ResultCompleted deliverable and verified inspection milestone.
Scope & Specifications
Complete domestic ground-up expansion featuring strip foundations, cavity blockwork, structural steel beam insertion to create an open-plan kitchen-diner, pitched slate roof matching the original property, complete electrical first/second fix with recessed downlights, and bi-fold glass door integration.
Jobsite Progression
Chronological Build Timeline
Visual proof log sequenced automatically by photo timestamp.
4 Mar 2024
Excavation of strip footings, concrete foundation pour, and sub-floor drainage run.
18 Apr 2024
Cavity wall brickwork raised to wall plate level and timber roof trusses pitched.
25 May 2024
First-fix electrical wiring, consumer unit routing, plumbing feeds, and Kingspan thermal insulation boards.
12 Jul 2024
Completed Result
Completed build handover: skim coat plastering, engineered oak flooring, roof lanterns, and bi-fold doors.